NDDC boss: N’Assembly forced us to pay for contracts not executed to get budget approval

The acting managing director of the Niger Delta Development Commission (NDDC), Prof. Kemebradikumo Daniel Pondei, weekend, listed some of the contracts the commission was allegedly coerced to pay by the National Assembly before its 2019 annual budget could be harmonized.

He alleged further that some Lawmakers, especially members of adhoc Committees held the Commission hostage over the years with the annual budget approval.

According to him, most of the contracts they were arm-twisted to pay, “were never done or sometimes, never completed.”

Pondei in a statement signed by his Special Adviser on Media, Edgar Ebigoni, listed the contracts and benefitting firms to include; Kith Global Ventures Ltd; Remedial Works at New Ogorode Roads Lot 3, at the cost of N493,684,169.00 and paid on the 17/03/2020, 301 Constr. Ltd; Remedial Works at Nja Road to Akoku Uno Lot 1, at the cost of N350,027,919.80 and paid on the 17/03/2020. Cracked Stone Constr. Ltd; Remedial Works at Ajaolubeti Road Environs Lot 2 at the cost of N394,010,952.10 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Township Road Lot 7, at the cost of N 431,053.035.20 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Township Road Lot 3, at the cost of N361,357,276.20 and paid on the 17/03/2020 and Grapik Ltd; Emergency at Umudee Internal Road, at the cost of N207,673,107.70 and paid the 17/03/2020.

Others were, Southland Constr. Ltd; Remedial Works at Umuduru Chukwu Umuorlu Road, at the cost of N518,409,089.30 and paid on paid on the17/03/2020. Southland Constr. Ltd; Remedial Works at Umuduru, at the cost of N519,949,949.10 and paid on the 17/03/2020.

Grandfox Global Services Ltd; Emergency at Ope Road Okigwe LGA, at the cost of N580,438,578.00 and paid on the 17/03/2020. Collincrystal Energy Ltd; Emergency at Benin Town Road Lot 6, at the cost of N348,853,184.60 and paid on the 7/03/2020 and Crism Constr. Building Ltd; Emergency at Eziama Osuama International Roads Isiala Mbano LGA, at the cost of N561,592,377.80 and paid on the17/03/2020.

Also paid were, Argento Ltd; Emergency at Benin Township Road Lot 4, at the cost of N382,805,411.60 and paid on the 18/03/2020. Two Rocks Cont. Ltd; Remedial Works at New Ogorode Road Lot 4, N500,875,848.00 and paid on the 18/03/2020. Elkan Zibson Ltd; Emergency Repairs of failed and unmotorable sections of Ezumoha Internal Roads Isiala Mbano LGA, at the cost of N531,150,414.29 and paid on the 19/03/2020. Cracked Stone Constr. Ltd; Remedial works on Failed and Unmotorable sections of Benin Township Road Lot 8, at the cost of N417,806,787.01 and paid on the 19/03/2020. PDH Global Logistics Ltd; Emergency Repairs of Failed and Unmotorable sections of Umuezuo Umuagbavu Road Remedy Failed and unmotorable sections of Chikwe Orlu Street Environment, at the cost of N543,247,587.35 and paid on the 20/03/2020. Aritel Oil and Gas; Remedy Failed and Motorable sections of Chikwe Orlu Street Environment, at the cost of N550,100,132.34 and paid on the 24/03/202.

Dis Concept and Solutions Ltd; Urgently Remedy Failed and Un motorable sections of Jessy and Jenny Road off peter Odily Road PHC, at the cost of N476,794,367.22 and paid on the 26/03/2020. Ogugo Concept and Solutions Ltd; Emergency Repairs of Failed and Unmotorable sections of Environs Yenagoa LGA, at the cost of N300,029,695.14 and paid on the 26/03/2020. Webster Global ventures Ltd; Instruction of emergency Repairs of failed and unmotorable sections Benin Township Road Lot 2 Oredo LGA, at the cost of N357,242,054.35 and paid on the 26/03/2020. Webster Global ventures Ltd; Remedial Works of Failed and unmotorable sections of Akuku Illah Road Oshimili North LGA, at the cost of N 463,489,890.13 and paid on the 26/03/2020 and Webster Global ventures Ltd; Remedial Works of failed and Unmotorable sections of New Ogorode Road Lot2 Sapele LGA, at the cost of N 466,416,380.71 and paid on the 26/03/2020.

He alleged “this blackmail scheme explains why the 2019 Budget of the NDDC was passed by the NASS Committee in March, 2020”, adding that, “we are talking about a budget that was billed to expire in May, 2020. This implication is that the management of the NDDC had only five weeks, to implement the budget of one fiscal year, and present a performance report on the same budget.

“This scheme has continued to play out, because as at this Month of August 2020, the budget of the NDDC for the 2020 fiscal year has not been passed by the Joint National Assembly Committee on NDDC. Sadly, nobody seems to care to ask questions because people are falling for the well-scripted smokescreen playing out in the two Chambers of the National Assembly.”

According to the statement, “this document, is among the many others tendered before the NASS Committee, which never saw the light of the day, and which the NDDC Committee were never allowed to speak on, when they eventually appeared before the Committee, during the public hearing. It was based on this evidential claim that the IMC of NDDC staged a walk-out, on the first day they were to testify before the Committee.

“The details of this list can be verified from the Central Bank of Nigeria, through a Freedom Of Information (FOI) request.

*Text by The Nation

Add a comment

Leave a Reply

Your email address will not be published. Required fields are marked *